Fusion Drill Motor
Production Chain
-
Manufacturing Plant
- 32x Iron Gear 24x Copper Wire 5x Primary Upgrade Module 16x Charged Lithium Coils 1x Magnetic Drill Motor
Resource Level: Greg
Total Base Resources (Automation Setup) Producing (1) Unit
Icon | Craft Cost Name | Craft Cost Amount |
Copper Ore | 1,400 | |
Tin Ore | 2,450 | |
Iron Ore | 1,550 | |
Lithium Ore | 2,000 | |
Icon | Craft Cost Name | Craft Cost Amount |
Copper Bar | 56 | |
Tin Bar | 98 | |
Iron Bar | 62 | |
Lithium Bar | 80 |
Total Intermediate (Automation Setup) Producing (1) Unit
Icon | Craft Cost Name | Craft Cost Amount |
Basic Drill Motor | 1 Each - 1 Total | |
Enhanced Drill Motor | 1 Each - 1 Total | |
Lightweight Machine Housing | 3 Each - 3 Total | |
Magnetic Drill Motor | 1 Each - 1 Total | |
Primary PCB | 80 Each - 80 Total | |
Charged Lithium Coils | 16 Each - 16 Total |
Total Machines For Automation (56) - Beta
Icon | Name | Count | PPS | PTS | PS | Time |
Primary Upgrade Module Crafter | 2 | 5 | 100 | 50 | 10s | |
Lithium Coil Charger | 1 | 3 | 100 | 100 | 30s | |
Coiler Plant | 3 | 0 | 0 | 0 | 10s | |
Extrusion Plant | 7 | 0 | 0 | 0 | 10s | |
Manufacturing Plant | 16 | 32 | 32 | 32 | 10s | |
PCB Assembling Plant | 2 | 0 | 0 | 0 | 10s | |
Basic Ore Smelter | 13 | 1 | 0 | 128 | 8s | |
Stamper Plant | 6 | 0 | 0 | 0 | 10s | |
Iron Gear Maker | 4 | 0 | 0 | 0 | 10s | |
Lightweight Machine Housing Crafter | 2 | 0 | 0 | 0 | 30s | |
10 | Power / Time Resources | 56 | 41 | 232 | 310 | 2m 18s |
Scans Required (4) | Total Given Research Points (52)
|
|
| ||||||||||||||||||
| ||||||||||||||||||||
Research Required (5) | Required Research Points (10)
|
|
| ||||||||||||||||||
|
| |||||||||||||||||||
Machines/Items Required (12) | Required Research Points (19)
MachineUpgrade
|
|
| ||||||||||||||||||
CraftingIngredient
|
|
| ||||||||||||||||||
| ||||||||||||||||||||
Machine
|
|
| ||||||||||||||||||
| ||||||||||||||||||||
ArtherUpgrade
| ||||||||